MAST CLIMBER
MAST CLIMBER MM50 MAST CLIMBER
Mast climbers are designed to work on the façade of the building, in a safe, and productive environment, replacing the old methods of scaffolding. Compared to scaffolding it allows to save time on the installation, operation, and save a lot on labour cost.
Mast climbers are much more productive, allowing to transport materials up to 5 tons on the decks, typical applications are: glass panels installation, cladding, stones, bricks etc.
Mast climbers are versatile, always adapting to the shape of the building: curved, inclined, cantilevers etc.improving your logistic cost, your labour cost, your productivity and your safety on site.
SINGLE MAST | ||||
Total Length | Total Service Load Q (kg) | |||
L (m) | Configuration | ![]() |
![]() |
|
13,4 | ![]() |
750 | 900 | |
11,8 | ![]() |
1300 | 1450 | |
10,1 | ![]() |
1500 | 1560 | |
7,1 | ![]() |
1900 | 1950 | |
4,1 | ![]() |
2200 | 2250 | |
2,8 | ![]() |
2400 | 2400 |
TWIN MAST | ||||
Total Length | Total Service Load Q (kg) | |||
L (m) | Configuration | ![]() |
![]() |
|
34,7 | ![]() |
1600 | 2050 | |
30,7 | ![]() |
2080 | 2480 | |
24,7 | ![]() |
2800 | 3120 | |
20,2 | ![]() |
3340 | 3590 | |
15,7 | ![]() |
3880 | 4070 | |
9,7 | ![]() |
4600 | 4705 | |
6,7 | ![]() |
4000 | 5023 |